Home > Reference > Consulting Reference

Cap Karoso Hotel, West Sumba, 2017, 100 keys

  • Complete MEP design, from power and water generation to distribution outlets
  • Off-grid solar PV power system with back-up diesel generator, centralized solar hot water, solar pool pumps, energy efficient Reverse Osmosis, water recycling etc
  • 40% savings on nominal power and operational energy consumptions compared to conventional designs, including for water systems

Nirjhara Retreat, Tanah Lot, Bali, 2015-2017, 42 keys

  • Complete study for hot water supply with comparative analysis and ROI calculation. Supply of heat pump systems
  • Design and supply of the waste water treatment plant with water recycling for gardening purposes
Reference Consulting Tanah Lot

Le Pirate Beach Club, for islands, 2014, 32 keys

  • Define a load profile for 32 bungalows resort located on a remote island
  • Design a solar hybrid system with Genset to minimize the use of fuel
  • Reverse osmosis system
Reference Consulting Pirate

Eco Diving Resort, Flores, 2012, 25 keys

  • Design for all energy supply from a PV power plant (380kWp) with genset back-up
  • Hot water system with solar thermal
  • Air Conditioners and heat pump systems design
Reference Consulting Flores

Ecoresort & Spa, Negara, Bali, 2010-2011, 150 keys

  • Design of a heat pumps solution for Spa
  • Restaurants and room’s hot water system
  • Solar pumping systems for all swimming pools, deep well and fountains
Reference Consulting Eco Resort